Work on the bunkers is moving along., Sand liners are in and sand has been installed in the front right bunker on #15. With decent weather this week, #6 and #15 will be complete.

Liners are installed and stapled down with sod staples.  A smear of Liquid Nails on top will make sure the staples don't move.

View of #15 with liner in place.  Front right bunker filled with sand.

Sand didn't move at all during 1 1/2 inches of rain on Saturday.

Bunker right side #6 green ready for sand.

Now that the soil temperatures are at 60 degrees, #7 tee is really filling in.