Liners are installed and stapled down with sod staples. A smear of Liquid Nails on top will make sure the staples don't move. |
View of #15 with liner in place. Front right bunker filled with sand. |
Sand didn't move at all during 1 1/2 inches of rain on Saturday. |
Bunker right side #6 green ready for sand. |
Now that the soil temperatures are at 60 degrees, #7 tee is really filling in. |
No comments:
Post a Comment