| Liners are installed and stapled down with sod staples. A smear of Liquid Nails on top will make sure the staples don't move. |
| View of #15 with liner in place. Front right bunker filled with sand. |
| Sand didn't move at all during 1 1/2 inches of rain on Saturday. |
| Bunker right side #6 green ready for sand. |
| Now that the soil temperatures are at 60 degrees, #7 tee is really filling in. |
No comments:
Post a Comment